Sri Lanka Electricity Act 2024 · As enacted · Part IV · Establishment of the National System Operator
13. Open access
Feedback & supportOfficial English translation. The Sinhala text prevails. Open the official Sinhala text, official PDF on documents.gov.lk
The Minister, in consultation with the
Minister
“Minister” means, the Minister assigned the subject of electricity in terms of Article 44 or 45 of the Constitution;
Regulator, the National Transmission Network Service
transmission network
“transmission network” means, all high voltage cables and overhead lines (not being an essential part of the distribution system of a licensee) used for conveying electricity from a generation station to a grid substation, from one generation station to another or from one grid substation to another, together with any transformers, switchgear and other works and equipment necessary to and used for the control and protection of such cables or overhead lines, and such buildings or part thereof as may be required to accommodate such transformers, switchgear and other works and equipment;
Provider and the distribution licensee, shall operationalize the applicability of open access from such date as is determined by Order published in the Gazette in terms of section 1 of this Act. Such open access shall be made operational in a phased manner and the extent of open access in successive phases shall take place in such manner as shall be prescribed and be subject to such conditions including payment of cross subsidies and other operational limitations as may be prescribed. Open access charges and any surcharge to be paid thereon shall be payable in such sum as determined by the Regulator in terms of the provisions of Part VIII.
open access
“open access” means, the non-discriminatory provision for the use of transmission network or distribution lines or associated facilities for supplying electricity to consumers eligible to purchase electricity directly from generation licensees under this Act, in accordance with directions issued by the Regulator. It permits third party suppliers to provide electricity to access the transmission and distribution network on the same conditions as the network owner or any other user, upon payment of a open access charges;
The surcharge received in terms of subsection (1)
shall be utilized to meet the cross subsidy within the area of supply of the distribution licensee:
Provided that –
such surcharge and cross subsidies shall be progressively reduced in the manner specified in the national tariff policy; and
such surcharge shall not be levied if open access is provided to a person who has established a captive generating electricity plant for carrying the electricity to a destination for his own use.